What are the precautions for the construction and rescue of the piles of steel piles?

Views:4    

Steel sheet pile as a new type of green building materials, in the construction of the pit is widely used. At that time, a small number of companies due to the operation is not professional, or in order to save money, did not strictly comply With the steel sheet pile precautions and to the occurrence of dangerous work which?


Precautions for Construction of Pile Foundation Pit Support


First of all, steel sheet pile construction process, in order to prevent accidents, follow the rules of operation can not be ignored. Before the start, all kinds of equipment and equipment must be overhauled, commissioning, to ensure that the machine in a good , Normal operation, and regular maintenance. Electrical appliances must be installed and repaired by full-time electrician, set signs.

Second, the steel sheet pile construction process, access to all types of electrical and other devices are not free to install, especially for the steel sheet pile construction operations, it is not a trace of sloppy, in order to ensure foolproof, any contact with The electrical equipment need to add a protective cover, to prevent the risk of bruises!

In addition, the steel sheet pile construction staff also need to be familiar with the work of the safety point of attention, stick to the post, is strictly prohibited transportation workers drink to work and work drink. Special types of personnel such as electricians, welders And other construction personnel, must be well trained, proficient in operating requirements, strict implementation of the safety of the operating procedures.

Finally, in addition to the above, the steel sheet pile in the plug when the need for a certain degree of security protection, we need to steel plate construction platform for some inspection, in the steel sheet pile construction process of steel sheet stability should be , In case of insecurity, remedial action should be taken immediately


CONTACT US TODAY!

Contact with us

Shunli Steel Group
Tel. : 0086 -25 - 84722733
Fax: 0086 - 25 - 84730966
Hand phone: 0086 - 13905190622;13739192886
Canada: 0019023936528 (Joanna Shaw)
QQ: 477798703 ; 236979001
E-mail: 13905190622@139.com; 
Skype: joannaxh-xh ; kevin-xu21
Home     About Us     Products      Technical Libirary      Certificates     Facilities      Contact Us
Copyright 2015 Shunli Cold-formed Steel Industrial Co., Ltd. All rights reserved