   admin@shunlisteel.cn        +86 13739192886 
Home » News » Industry knowledge » Cold formed steel sheet pile MMU9-1,MMU9-2,MMU9-3,MMU10-1

Cold formed steel sheet pile MMU9-1,MMU9-2,MMU9-3,MMU10-1

Views: 6    

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Sheet piling MMU9-1 or MMU9-2 may have a huge impact on MMU10-3's disadvantaged communities with limited MMU10-1 opportunities. The horizontal resistance is typically composed of only the normal force acting on the base of the wall multiplied by the sliding resistance coefficient. MMU9-1 rope grabbing devices are prohibited in all constraint applications. WAC-296-24615. A study found that if a worker Power Steel had to pay for this, the MMU 12-4 sheet piles for sale apprenticeship program would cost between $40 thousand and $150 thousand. After completing the apprenticeship program, trade union construction workers can earn $35000 to $70000 a year.


The normal force on the basis of the action includes the weight of the soil reinforcement, the additional load on the top of the soil and the vertical MMU 12-3 component designed to design the lateral MMU9-2 pressure on the pressurized surface. The anti falling device can move the MMU 12-2 lifesaving rope up and down, hanging on the fixed top or horizontal anchoring point or life line, and the belt or suspenders are connected to the anchoring point. The sliding resistance coefficient of MMU 12-1 frictional resistance used to calculate the wall's base is the minimum value determined by the following MMU9-3. LAANE analyzed the apprenticeship timetable of the construction industry to identify the vulnerable workers in the construction industry according to the POLA employment policy, and MMU10-1 will get the income.  It is located at the bottom of the wall, of which the frictional angle of reinforced soil or foundation soil is the minimum. The falling system MMU11-1 is used in conjunction with the warning line system, in which the qualified personnel do not have to work extra, and can monitor the staff's proximity to the falling risk when warning the MMU11-2 line to work between the unprotected side and the edge, including the low roof or the front edge of the walking / working surface.


Using cold formed steel sheet pile MMU11-2 or MMU11-2 close to continuous soil MMU12-1 to reinforce MMU12-2 layer, of which R is the soil reinforcement layer with minimum interfacial angle of MMU 11-2. It shows the wage progress of the prototype workers in their apprenticeship, and on average, MMU12-1 lasts for five years. A decelerator, which contains a drum MMU 11-1 wound line, in the normal staff movement process, under slight tension, Cagayan de Oro may slowly pull out or retract from the drum, and automatically lock the MMU12-2 drum and arrest the fall after the fall. If site specific data of Tanr are not available, please use 0.67 Tan as sliding resistance coefficient. A prototype construction worker halfway through the MMU 10-1 apprenticeship program will earn slightly above $37000 a year. A flexible cable, cable or rope for fixing a body seat belt to a lifeline or a fixed point with a MMU12-3 integral shock absorber. The sum of the driving forces acting on the wall is typically composed of horizontal components of the lateral pressure designed on the surface of the pressure.


SectionDimensionsSection areaMassMoment of inertiaModulus of section



WidthHeightThickness
PileWall


wht/s





mmmmmmcm2/mkg/mkg/m2cm4/mcm3/m
MMU5-16001509.5119.7556.4943825510
MMU5-260015010126.1159.4994050540
MMU6-1600280689.642.270.338960640
MMU7-1600300693.424473.3310350690
MMU7-2600340698.0946.27712665745
MMU7-3600360699.5846.978.1713320740
MMU8-16003406.5103.3448.781.1713260780
MMU8-26003257109.9851.886.3313406825
MMU8-3600355711353.48914821835
MMU8-4750320687.151.368.413200825
MMU9-16003606.510549.582.516920940
MMU9-26003307.5120.656.894.715097915
MMU9-37503207101.7459.979.915120945
MMU10-16003707114.4453.989.8196101060
MMU11-16003807.5123.3558.196.8222301170
MMU11-26003608131.662103.3199801110
MMU12-16003808.5140.366.1110.17228001200
MMU12-26003109137.664.8108186001200
MMU12-36003109.5144.668.1113.5192201240
MMU12-4500360814456.5113207901155
MMU12-57004407.512367.696.57266201210
MMU12-66003609148.670116.7222481236
MMU12-74503601018465144.4224821249
MMU13-16754207.512465.697270901290


CONTACT US TODAY!

Related Products

Contact with us

Shunli Steel Group
Tel: 0086 -25 - 84722733
Fax: 0086 - 25 - 84730966
Hand phone: 0086-13739192886;
001-9023936528(Canada & USA)

QQ: 236979001
E-mail: admin@shunlisteel.cn

Get in touch

CONTACT US TODAY!
Copyright 2015 Shunli Cold-formed Steel Industrial Co., Ltd. All rights reserved sheet piling prices