english_0c1f246bf9a60e2bc08750f9d206e186 usa_0953a82cc3897587c37e521ad75bb821 spain_4c76471510ea7184466319046fae92f5 china_34b3265b41b34e5b2be4e401f401ea91 法国 巴西 印度 新加坡 new_zealand 埃及 
Home » Technical Libirary » Industry knowledge » The Steps of Lassen Steel Sheet Piles Construction

The Steps of Lassen Steel Sheet Piles Construction

Views:6    

图片1Lassen steel sheet pile is widely used in major engineering buildings due to its high strength, simple construction and good durability. It plays an important role in permanent engineering, such as the steel sheet pile project at the port terminal, which can greatly improve work efficiency. In the bridge project, it can also function as a retaining wall.

 

The detailed steps of Lassen steel sheet piles construction are as follows.

 

Step 1: Ensure that the steel sheet pile meets various construction indicators before construction.

 

Step 2: During the construction process, do not remove the support during excavation, concrete pouring or transportation. Because the support is so heavy that heavy objects cannot be put on it.

 

Step 3: In the measurement of the retaining wire, according to the width design requirements of the foundation pit and the groove, the bottoming position of the steel sheet pile should be measured, and the position should be marked.

 

Step 4: When inspecting the steel sheet pile, we must first confirm whether its surface is the same as the standard. If the appearance of the steel sheet pile has certain corrosion, the thickness of the section should be measured. In addition, it is necessary to inspect the chemical composition and mechanical properties, the tensile and bending of each type of steel sheet pile.


CONTACT US TODAY!

Contact with us

Shunli Steel Group
Tel. : 0086 -25 - 84722733
Fax: 0086 - 25 - 84730966
Hand phone: +86 13905190622
001 9023936528(Canada & USA)

QQ: 477798703
E-mail: admin@shunlisteel.cn ; 
Skype: joannaxh-xh
Copyright 2015 Shunli Cold-formed Steel Industrial Co., Ltd. All rights reserved sheet piling prices