english_0c1f246bf9a60e2bc08750f9d206e186 usa_0953a82cc3897587c37e521ad75bb821 spain_4c76471510ea7184466319046fae92f5 china_34b3265b41b34e5b2be4e401f401ea91 法国 巴西 印度 新加坡 new_zealand 埃及 
Home » Technical Libirary » Industry knowledge » steel sheet piling jsp2, jsp3, jsp4

steel sheet piling jsp2, jsp3, jsp4

Views:6    

FSP steel sheet pile - to ensure very much, should pay attention to the quality of the steel sheet pile manufacturers on the first, to pay attention to in the process of pile driving, driving in time do not use too much strength to knock, and must be installed on the pile cap construction process, so to avoid knocking in process of pile top knocked worst. In the process of steel sheet pile insertion, its perpendicularity is usually not determined. Therefore, it is very necessary to detect perpendicularity in the process of construction. Once there is a poor vertical condition, it is necessary to make corrections for two construction. At the same time, for the first time in the construction of the scoring depth also have certain requirements in the beating process, as long as the knock to half the depth is good, then the verticality detection, so that when the test, if there are problems, on the pile pulling out is also very convenient. During the second time of construction, we must control the depth as well. If the verticality test results are very good, we can continue to finalize it. In the process of cofferdam, there will be some accidents. It is very easy to appear outside the cofferdam, and the water level is lower than the water level. In order to better balance the relationship between them, we must extract the water in the cofferdam and seal it after the extraction. In the process of pumping, it is also very easy to leak. Therefore, when pumping, we should also use the power of small materials to seal the location of leakage of steel sheet piles.

SectioDimensioMaMoment of inertiaModulus of sectio



WidthHeightThicknePer pileWall




ht





mmmmmmmmkg/mkg/m2cm4/mcm3/m
PU 66002267.56.445.6766780600
PU 76002268.57.149.983.17570670
PU 86002808.08.054.590.911620830
PU 96002809.08.758.898.012830915
PU 116003608.88.461.8103.0197601095
PU 1660038012.09.074.7124.0304001600
PU 2060043012.410.084.3140.5430002000
PU 2560045214.210.093.6156.0564902500
L2S50034012.3969.7139.4272001600
L3S50040014.11078.9157.8400102000
L4S50044015.51086.2172.0550102500
L5S50045020.611.5106.0212.0720003200
JSP240020010.5048120.08740874
JSP340025013.0060.0150.0168001340
JSP440017015.5076.1190.0386002270
GU12-50050034098.556.6113.2196401155
GU13-50050034010.09.060.8121.7213901260
GU15-50050034012.010.069.3138.6248101460
PU6R6002806.06.042.270.08940640
PU7R6002806.56.344.374.09580685
PU8R6002807.56.948.781.010830775
PU9R6003607.06.449.582.016930940
PU10R6003608.07.053.890.0189601055
PU11R6003609.07.658.197.0209601165
PU13R67540010.07.465.697.0256901285
PU14R67540011.08.070.5104.0280001400
PU15R67540012.08.675.4112.0302901515


These are widely used for them

Larssen

nest on walls and piers. Lock is the best in the

U.

-Series Siliar series.The AZ series has the advantages of: (i) The proportion of the section module

S

The mass is very high; (ii) The high section module M means a higher moment of inertia; (iii) The belts are very small because the moment of inertia is very high.


CONTACT US TODAY!

Contact with us

Shunli Steel Group
Tel. : 0086 -25 - 84722733
Fax: 0086 - 25 - 84730966
Hand phone: +86 13905190622
001 9023936528(Canada & USA)

QQ: 477798703
E-mail: admin@shunlisteel.cn ; 
Skype: joannaxh-xh
Copyright 2015 Shunli Cold-formed Steel Industrial Co., Ltd. All rights reserved sheet piling prices